A-Dock Replacement
A-Dock
Project Background
Built in 1970’s
Partially rebuilt ~2003
No flying ramp
No stabilization poles
No winches
Floats were sinking
Excessive Wood Rot
Concrete attachment cracked
Anchor cables rusted
Tom Bleier
Director - Dock Steward
A-Dock
Completed Spring 2025
8 Slip (Same)
60ft aluminum ramp
4 stabilization poles
2 new winches/cages
Taller floats
Aluminum construction
Concrete attachment repaired
New stainless cables
Stronger, cooler decking material
Cost: $243K
$30K per slip
Life Expectancy 40-50 years